久久中文字幕综合婷婷-久久中字-久久终合-久久专区-国产美女视频一区二区三区-国产美女网

Welcome to the official website of Shenzhen Taiyou Electronic Technology Co., Ltd!

Shenzhen Taiyou Electronic Technology Co., Ltd

20年專注于立式注塑機(jī)的生產(chǎn)與制造

24小時(shí)全國(guó)服務(wù)熱線:0755-33855605

Shenzhen Taiyou Electronic Technology Co., Ltd

Address: No.2, North 1st Road, Tianyang Third Road, datianyang Industrial Zone, Songgang town, Bao'an District, Shenzhen
Telephone:0755-33855605
Fax:0755-33855606
E-mail:twtaiyou@163.com
Website:http://m.shihuatv.cn

當(dāng)前位置:首 頁(yè) ? News ? Industry trends

Operation elements of vertical injection molding machine

文章出處:臺(tái)佑電子 | 作者:臺(tái)佑電子 | 發(fā)表時(shí)間:2020-07-07

In the plastics processing industry, Shenzhen Taiyou Vertical Injection Molding Machine is a kind of expensive injection molding equipment. The output of vertical injection molding products accounts for more than 30% of the total amount of plastic products. It has the characteristics of high production automation, short production cycle, strong adaptability and high production capacity. Except for fluoroplastics, almost all thermoplastics can be molded by this equipment. Relay) contactor control system is usually used for mold clamping, injection, holding pressure and mold opening of the original injection molding machine. The wiring of detection elements is chaotic, the reliability is poor, and the integration is low. In order to improve the function of the injection molding machine and improve the reliability of its production process.


The operation process of vertical injection molding machine can be roughly divided into: preheating, mold clamping, injection, calendering and holding, mold opening, top punching, flash evaporation and other processes. These processes are batch production processes, and each process can be controlled according to changes in time or direction. At different times or directions, the device's travel switch or proximity switch advocates the timer of the central processor to start timing. If the motion mechanism reaches the end point or the specified orientation within the specified time, the corresponding travel switch or proximity switch will be triggered, the system will consider that the execution of the action has ended at this time, otherwise it will stop the machine and issue a defect alarm. Because the vertical injection molding machine has many movements, some movements require skills, so multiple orientation control points must be set to switch parameters. In the process of time care, one after another is advocated, distinguishing the actions at the time, and after admitting that they are correct, opening or closing the corresponding implementing agencies and ending the routine actions. The entire production process has gone through seven processes, so this system can control the automatic end of these seven processes in turn.


The quality of the injection molded product depends on the manipulation of the technical parameters of the injection molding process, including the input variables of the simulation method, such as the barrel temperature, polymer melt temperature, screw temperature, mold temperature, injection system pressure, screw speed, etc. The digital variable method inputs variables, such as the continuous direction of the screw exit, the front and back direction of the injection seat, the front and back movement of the template, and overtravel, etc. The programmable controller technology was used to transform the injection molding machine system, overcoming the shortcomings of the traditional open-loop control method, and ending the closed-loop control, so that the anti-interference ability and control accuracy of the programmable controller control method were greatly improved compared with the traditional method. It can not only control the switching logic, but also control the analog quantity (such as temperature, pressure, flow, speed, etc.). By closed loop with the help of keyboard and liquid crystal display or digital ladder diagram, the operation process ends. There are three kinds of ladder diagram programming methods: root instruction scheme; step-by-step instruction scheme; shift instruction scheme. Flash, you can set or correct skill process parameters, and have an early warning system and defect flash indicator to monitor the production process, and then greatly advance the function of the entire machine. The transformation cost of PLC control system is low, the construction period is short, the reliability and safety of the system are significantly improved, and it has certain application value.

咨詢

Telephone

Consultation telephone

0755-33855605

Service hotline

13902910763

WeChat

二維碼

Mobile website

Mailbox

Enterprise mailbox

twtaiyou@163.com

主站蜘蛛池模板: 国产精品成久久久久三级 | 毛片在线不卡 | 色婷婷在线视频观看 | 免费一级成人免费观看 | 欧美一级视频免费 | 搡老女人免费视频 | 亚洲第一综合色 | 日本中文字幕免费 | 在线综合网 | 中文字幕免费在线播放 | 久久99热只有频精品6不卡 | 斯大林格勒战役免费高清观看 | 亚州春色 | 国产福利小视频在线播放观看 | 99国产热 | 黄页在线免费观看 | 野外被强日本在线观看 | 国产精品国产精品国产三级普 | 欧美黑人操 | 91制片厂制作果冻传媒网站 | 午夜视频福利在线观看 | 久久久精品国产 | 亚洲国产高清视频在线观看 | 国产一级特黄高清免费下载 | 美国毛片视频 | 在线亚洲天堂 | 精品视频中文字幕 | 久久精品亚洲综合一品 | 三级理论中文字幕在线播放 | 天天做天天爱天天干 | 91色老久久精品偷偷蜜臀 | 国产精品自拍一区 | 久热re在线视频精品免费 | 久久精品a亚洲国产v高清不卡 | 操美女视频网站 | 日韩精品一区二区三区在线观看 | 天天做天天爱天天爽综合网 | 日日视频 | 国内午夜免费鲁丝片 | 不卡视频一区二区三区 | 国产专区91 |